babalon: (Default)
[personal profile] babalon
I am exhausted. It's only 10:15am and I'm exhausted from the bathroom remodel. See - this time, we finally had everything ready for them to bring in and install the slab of stone for the vanity. Great. Except:
The stands and the drawer base were not at the same height. This required calls to the Contractor to send his guy over to fix things. We figured out that I really didn't want the metal posts on top of the stands anyways, and so they were able to remove those entirely and then raise the stands because they had feet that could be raised.
So the construction guy goes away and I go downstairs.
The Contractor calls and tells me not to touch the stone over the weekend so the epoxy has time to set.
The stone guys come and say they're done but... they bring me upstairs and say:
oh - this part, needs the wood to be shaved so the sinks will fit. WHAT???
The holes in the stone for the sinks are *NOT* centered above the stands! So of course, the sinks won't fit down into the stands properly.
Mind you, the stone has been epoxyed in place.
The stone guys leave.
Um, now what.
I look at the hideous thing and realize that all that we need to do is to move the stands. BUT - can we?
So I have panicked calls to the stone guys *and* the construction guys to come back and fix things BEFORE the epoxy sets.
Eventually (seems like forever, but was only about 20 minutes), they both come back, and move the stands, and voila! the sinks fit and everything's fine.

BUT WTF do *I* have to figure this stuff out? Why would they even *do* it the other way? I HATE this. I HATE having to suddenly, with no warning, manage the damn bathroom remodel and deal with having to fix things that go wrong that I hired someone to do properly. I mean, this is why I hired the "full-service" guys in the first place so I wouldn't have to come up with instant answers. But he kept forcing me into instant answer situations, so I fired him. And got my own Contractor, Lupe, who is wonderful, to take over and fix things. But this stone guys belonged to the old contractor and were just lazy asses who didn't give a fuck. They were just doing their job (badly) and didn't care whether it was right or not.

If I wasn't a bulldog by nature and stood there looking at the damn thing and trying to figure out what to do and calling people to immediately come back and fix it, we'd have had to *live* with offcenter sinks and stands for however long we owned this house, because once that epoxy set, it would have been a disaster to try to fix things.

And this is stuff that I've been dealing with all along with this remodel.
From:
Anonymous( )Anonymous This account has disabled anonymous posting.
OpenID( )OpenID You can comment on this post while signed in with an account from many other sites, once you have confirmed your email address. Sign in using OpenID.
User
Account name:
Password:
If you don't have an account you can create one now.
Subject:
HTML doesn't work in the subject.

Message:

 
Notice: This account is set to log the IP addresses of everyone who comments.
Links will be displayed as unclickable URLs to help prevent spam.

Profile

babalon: (Default)
babalon

July 2009

S M T W T F S
   1234
56789 1011
12131415161718
19202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 26th, 2017 06:01 pm
Powered by Dreamwidth Studios